We hired Stephen to repair our deck, and he did such a great job that we also hired him to add a bathroom to our finished basement. He was communicative, flexible, and worked clean. We are elated with how it all turned out. Thank you for helping us love our home!
Home Remodeling
Home Remodeling Contractors in Upstate New York
Kitchens, bathrooms, flooring and full interior renovations, run by one crew from demolition through the punch list.
In short
The thing that decides whether a remodel goes well is not the finishes, it is sequencing. One contractor holding the whole schedule means the tile setter is not waiting on the electrician who is waiting on an inspection nobody booked.
Remodeling goes wrong in the gaps between trades. The demo crew finishes and leaves, the plumber comes a week later, the inspector cannot get out until the following Thursday, and the whole thing stalls with your kitchen in boxes. Almost every horror story we hear from homeowners is a scheduling failure rather than a workmanship one.
We run interior work the same way we run a roof. One crew, one schedule, one person you call. That means we are honest about start dates rather than booking you in and disappearing, and it means when something is found behind a wall, and in houses of this age something usually is, you get told immediately with a price rather than discovering it on the final invoice.
The housing stock across our area shapes what these jobs turn into. A 1920s house in Schenectady or Troy will have knob and tube somewhere, plaster that does not like being disturbed, and framing that is not on any modern module. A Clifton Park build from the nineties has none of that but often has a layout worth opening up. We quote what is actually in front of us rather than a square footage rate.
What we handle
Interior work we take on
Kitchens
Full renovations and targeted updates. Cabinetry, counters, flooring, lighting and the coordination of plumbing and electrical that makes the difference between six weeks and four months.
Bathrooms
Complete gut renovations through to tub-to-shower conversions. Waterproofing done properly behind the tile, because that is the part nobody sees and the part that fails.
Flooring
Hardwood installation, sanding and refinishing, tile and engineered products. Refinishing original floors is frequently the highest return work in an older house.
Whole-home and structural changes
Opening up layouts, removing walls where the framing allows it, and full interior renovations. Anything load bearing gets engineered rather than guessed at.
How it runs
How a remodel runs
Walk the space and talk budget
Honestly, early. It saves everybody time to establish whether the project you have in mind and the number you have in mind are the same project.
Scope and written estimate
What is included, what is not, what the allowances are for fixtures and finishes. Ambiguity in a remodel scope becomes an argument later, so we would rather have the conversation now.
Permits and scheduling
We pull permits and book inspections. You get a realistic start date, not an optimistic one designed to hold the job.
Build, with the surprises surfaced
Demolition, rough-in, inspection, finish. When something turns up behind a wall you hear about it the same day with a price attached.
Punch list and handover
We walk it with you and write down everything that is not right, then fix it. The job is done when you say it is, not when the last invoice goes out.
Why us
Why run your remodel through us
One crew, one schedule
The trades are coordinated by the people doing the work rather than handed between companies who each blame the last one for the delay.
We know old houses
Plaster, knob and tube, balloon framing and floors that are not level anywhere. Most of the housing stock here predates 1960 and it behaves accordingly.
Surprises get surfaced immediately
Opening a wall in a hundred year old house finds things. You hear about it that day, with a price, not at the end.
Reviews
What customers said about this work
Google reviews from customers we did home remodeling for.
Needed repair of flooring area prior to new dishwasher install. minor adjustments to kitchen sink cabinet door and bifold doors in kitchen. I would use him again...Very friendly ,easy to work with. Sticks to a schedule which is extremely important to me. Will use him for further projects
Stephen is 100% the BEST overall Contractor out there! He can do it ALL! He crushed the project I gave him which was no small feat! He insulated, Drywalled, Ran electrical, Plumbed, Tiled, Painted and basically Built an entirely new Bathroom & Laundry room for us! Can’t thank him and his crew enough!!
Where we work
Remodeling across the region
We take interior work throughout our service area. The older village and city stock in Albany, Rensselaer and Schenectady counties tends toward full gut renovations, while the newer builds through Clifton Park, Malta and Halfmoon in Saratoga County are more often about opening up a layout that has aged badly.
We cover Albany County, NY, Rensselaer County, NY, Saratoga County, NY, Schenectady County, NY, Bennington County, VT, Berkshire County, MA.
Questions
Remodeling questions
A bathroom is typically two to four weeks on site, a kitchen four to eight, assuming materials are on hand when we start. The single biggest cause of overrun is fixtures and cabinetry arriving late, which is why we push to have the long-lead items ordered before demolition rather than during it.
Usually yes for anything involving plumbing, electrical or structural change, and no for purely cosmetic work like flooring or paint. We handle the permit and the inspections. Requirements vary by town and Massachusetts is the strictest of the three states we work in.
For most single-room projects, yes. For a kitchen you will want a plan for cooking, because you will be without one for weeks rather than days. For a whole-home renovation it is usually better not to. We will tell you plainly which category yours falls into.
In writing, before the work happens. A change gets priced and agreed rather than absorbed and argued about later. This applies both to things you decide you want and to things we find behind a wall.
We help with layout and practical decisions and we will tell you when something will not work structurally or will cost far more than it is worth. For full interior design and detailed drawings we would point you at a designer and then build to their plan.
Related
Other work we take on
Finish Carpentry & Trim Work
Crown molding, wainscoting, built-ins and casing. The detail work that separates a renovation from a repair.
Learn more about Finish Carpentry & Trim Work
Custom Woodworking
Built to fit the room it lives in: cabinetry, shelving, mantels and furniture-grade pieces in the species you pick.
Learn more about Custom Woodworking
Exterior Painting
Prep-first exterior painting on clapboard, cedar and trim, using coatings that survive a Northeast freeze and thaw cycle.
Learn more about Exterior Painting






